Utility Projects

7

Tamarisk Neighborhood Project, Rancho Mirage, CA

Utility Undergrounding of electrical distribution, telephone, and cable service lines for more than 400 properties. Project cost: $6.4M.  My role: PM for the project – oversaw all phases, including project requirements, planning, community workshop, design, utility coordination, easement acquisition, bid process, construction, inspections, and project closeout/acceptance.

Before

After

Before

After

7

Magnesia Falls Cove, Mirage Cove, and other citywide neighborhoods, Rancho Mirage, CA

Utility Undergrounding of electrical distribution, telephone, and cable service lines for approximately 950 properties. Project cost: $19M.  My role: PM for the project – oversaw all phases, including project requirements, planning, community workshop, design, utility coordination, easement acquisition, bid process, construction, inspections, and project closeout/acceptance.

Before

After

Before

After

7

Other Utility Projects

  • Utility Relocation and Undergrounding (SCE 115 kV transmission lines and poles, IID distribution, and cable tv fiber optic services) – 1.5 mile along Bob Hope Drive, Rancho Mirage, CA.  Project cost: $450K.
  • Utility Undergrounding (IID distribution services) – .75 mile along Dinah Shore Drive, Rancho Mirage, CA.  Project cost: $400K.
  • Utility Relocation (SCE 115 kV transmission lines and poles) – .75 mile along Dinah Shore Drive, Rancho Mirage, CA.  Project cost: $1.8M.